Location: Melbourne CBD
Project Type: Public Infrastructure – Bridge Restoration
Scope of Work
- 3-year staged restoration of Princess Bridge.
- Wet abrasive blasting and repainting of steel arches and structural elements.
- High-access operations over the Yarra River.
Challenges
- Strict safety and environmental compliance (dust control, Water catchment).
- Limited working windows around special events.
- Protecting heritage features while applying modern protective coatings.
Solutions & Approach
- Used encapsulated blasting rigs and EPA-compliant disposal methods.
- Operated under detailed traffic and pedestrian management plans.
- Applied high-performance, long-life coating systems in consultation with engineers.
Results
The bridge’s iconic appearance has been preserved and future-proofed. Our team’s workmanship ensured the structure remains safe, clean, and vibrant — contributing to Melbourne’s public realm for decades to come.